Wood Floor Installation Steps In Detail

- Mar 29, 2018 -

The physical properties of WPC than logs better than wood, good dimensional stability, not easy to crack, warping, non wood knots, twill, various products coated or composite surface can be made of brilliant color, so no regular maintenance. So this is all people love to decorate their Home Furnishing with plastic wood floor, today Xiaobian take you together to understand wood floor installation steps in detail.

A wood floor installation preparation

1, from a professional point of installation of floor, before starting the installation work, we must maintain a good state of wood floor dry, smooth, clean, so as to better ensure the subsequent installation work smoothly.

2, ready to install tools drills, ordinary woodworking tools, gloves, stainless steel screws, wherein the drill is installed the WPC tool. The WPC brittle in the fixed floor and keel, must use a drill hole, then loaded the screws, avoid damage to wood floor.

Two, wood floor installation steps

1, fixed wood keel

The wood keel uniform arrangement of the tile on the cement floor, every piece of long distance is 30cm. Drill holes on the keel with electric drill. The diameter of the leading hole can't be less than the diameter of the screw, then screw the screw into the drilling hole, and fix the keel on the cement floor. The nail head should be all screwed into the keel and do not expose it, otherwise, the floor layout will be uneven.

2. Fix the first floor

Each piece of wood floor on both sides of the groove are yin and yang. In the first block paving the floor, can be the first floor outside the Yang groove or rubbed with carpenter tools cut off points, then the surface of the floor with the drill hole, open screw nail, which is fixed on the keel.

3, fixed second pieces of floor

The second pieces of wood floor of the tank Yang Yin groove position of the first floor stuck, then guide hole in Shenyang groove side surface drill second floors, screwed into the screw fixed on the keel, screw spacing during installation by the construction personnel to control, not too dense, ensure the solid line. But behind the wood floor installation is as before, do not need to do more to explain.


Related News

Related Products

  • Eco-friendly WPC Outdoor Dustbin
  • Co-extruded WPC Decking
  • WPC Hollow Decking For Swimming Pool
  • Composite Fence Plank
  • New Style Eco Friendly Wood Plastic Composite Wall Siding Panels Clading Panels Sectional Panels
  • Outdoor Boundary WPC Waterproof Railing